MARIS PROJECTS


Huygensweg 26
  5482 TG Schijndel
  The Netherlands
   
+31 73 54 939 18
+31 73 54 778 62

New arrival - Flare installation

From a disassemblation of a wastegas facility, a second hand flare station is received. Before, this installation is used in a waste gas facility (former waste dump). This installation include:

  • Blower;
  • Valves;
  • Temperature sensors;
  • Flow measurements;
  • pressure sensors;
  • complete controlboard with datalogging;
  • Flare.